Click to Sign up for a Free Newsletter read by 50,000 people across the world

NewsArticlesInterviewsPress releasesRegulatoryResourcesCompaniesProductsMaterialsMachineryEventsSearchNewsletter

Home › Article

Article

India's revised Schedule M: turning GMP requirements into an operational upgrade plan

Published on Pharmaceutical Weekly 27 November 2026 · 9 min read

By Helen Davidson

Illustration of three pharmaceutical staff reviewing a floor plan beside a checklist board in a manufacturing hall
Image credit: Illustration for Pharmaceutical Weekly · Image source

What the revised Schedule M notified on 28 December 2023 requires, how its timeline applied to large and smaller manufacturers, and a gap-based way to plan the upgrade, as of 27 November 2026.

India's revised Schedule M turned a short list of good manufacturing practice (GMP) conditions into a full quality-system standard. For a plant, the legal text is only the start. The work is turning each clause into a procedure, a record and a piece of equipment that an inspector can check. This article summarises the framework and its timeline from official sources, then proposes a way to plan the upgrade.

Last reviewed: 27 November 2026. Passages marked as interpretation are the author's analysis, not requirements of the notification. Compliance dates and conditions for a given licence can change by notification, so confirm your own position with the licensing authority.

What was notified and when it applies

On 28 December 2023 the Ministry of Health and Family Welfare notified G.S.R. 922(E), which substituted a new Schedule M in the Drugs Rules, 1945. The heading changed from "good manufacturing practices" to "good manufacturing practices and requirements of premises, plant and equipment for pharmaceutical products". The Press Information Bureau (PIB) describes two groups of manufacturers. Those with turnover above Rs 250 crore had six months to comply, and the revised Schedule M has applied to them since late June 2024. Those with turnover of Rs 250 crore or less had twelve months.

In February 2025 the Ministry gave smaller manufacturers a conditional extension. A manufacturer in that group could submit a plan for upgrading, in Form A, to the Central Licence Approving Authority within three months of 11 February 2025. For those that did, the implementation date moved to 31 December 2025. The Ministry's own notification, G.S.R. 127(E) of 11 February 2025 (the Drugs Amendment Rules, 2025), inserts this as a proviso for small and medium manufacturers with turnover below Rs 250 crore, who apply in Form A within three months with a plan of upgradation. Form A asks the applicant to state the time required, "not beyond 31st day of December, 2025", and to undertake to begin upgradation within three months of the application. That date has now passed. The notifications cited here give no later date, so a smaller manufacturer should check its status with its licensing authority and not rely on a summary.

A pharmaceutical quality system with named responsibility

Part I begins with the pharmaceutical quality system. The manufacturer must take responsibility for product quality so that products are fit for their intended use, meet the licence and do not put patients at risk. The Schedule places the ultimate responsibility for an effective quality system on senior management, and it asks for periodic management reviews, unless otherwise justified at least annually. The quality system must be defined and documented, for example in a quality manual. It also asks for investigation of deviations and suspected defects with an appropriate level of root cause analysis, and for corrective and preventive actions whose effectiveness is monitored.

Quality risk management is described as a systematic process for assessing, controlling, communicating and reviewing risks to product quality. The text requires the evaluation of risk to rest on scientific knowledge and process experience and to link to patient protection. It also requires the effort, formality and documentation to match the level of risk. Interpretation: that last point matters for smaller sites. A proportionate risk process is allowed, but an undocumented one does not meet the text.

Product quality review

The Schedule asks for regular, periodic or rolling quality reviews of all pharmaceutical products, including products made only for export. The aim is to confirm that the process is consistent, that specifications for starting materials and finished products remain appropriate, and to highlight trends. Reviews should normally be documented annually and include at least a review of starting and packaging materials, especially from new sources, and of supply chain traceability of active substances.

Qualification, validation and change control

Qualification and validation are described as continuing programmes with periodic review, and not one-off tasks. The key elements are set out in a validation master plan. The text names design qualification, installation qualification, operational qualification and process validation, and it asks for particular attention to analytical methods, automated systems and cleaning procedures. Changes that may affect product quality must go through a formal change control system, with written procedures covering raw materials, specifications, analytical methods, facilities, support systems, equipment including computer hardware, processing steps, labelling and packaging, and computer software. Proposed changes are reviewed and approved by the quality unit.

Complaints, recalls and self-inspection

Complaints about possible defects must be recorded with the original details and investigated, with a named person responsible. Where a defect is found or suspected in a batch, the text asks whether other batches, including any containing reprocessed product from it, should be checked. Recall procedures must be written, regularly reviewed and capable of starting at any level of the distribution chain, and the licensing authorities must be told of an intended recall for a defective product. Self-inspection is meant to find shortcomings and recommend corrective action. It should be routine, can also follow a recall or repeated rejections, and its recommendations must be implemented and followed up.

Premises and hygiene

The premises section requires that premises be located, designed, constructed, adapted and maintained to suit the operations, and that layout aims to reduce the risk of errors and allow effective cleaning and maintenance. Where dust is generated during sampling, weighing, mixing or packaging of powders, measures must prevent cross-contamination. The sanitation section covers personnel, premises, equipment, materials, containers and cleaning agents as sources of contamination to be eliminated.

Air handling, equipment, water and computerised systems

The general part of the notified text goes beyond building layout. On premises, it says electrical supply, lighting, temperature, humidity and ventilation must be appropriate and must not harm products during manufacture and storage, or the accurate working of equipment (clause 12.2.7). It also requires that the design, installation, qualification and maintenance of heating, ventilation and air conditioning (HVAC) systems of the manufacturing plant be carried out (12.2.8). QC laboratories need a separate air supply from production areas, and biological, microbiological and radioisotope laboratories need separate air-handling units (12.7.3).

For equipment, the text asks for equipment that is located, designed, constructed, adapted and maintained to suit the operations, with a layout that limits the risk of errors and allows effective cleaning (13.1). Balances and measuring equipment must be calibrated on a fixed schedule (13.5). Production equipment must be cleaned on a fixed schedule (13.6). Defective equipment must be removed or clearly labelled (13.10). Non-dedicated equipment must be cleaned between products using validated cleaning procedures (13.12), and current drawings of critical equipment and support systems must be kept (13.13).

On water, clause 14.6 requires water used in manufacture to be suitable for its intended use, with a validated system that treats water from any source to potable standard and then to purified water meeting pharmacopoeial specification. Purified water is to be used for all operations except washing and cleaning, where potable water may be used. Storage tanks must not harm water quality and must prevent microbial growth, and tanks must be cleaned periodically with records kept by the licensee.

Computerised systems have their own clause (20). GMP-related systems must be validated, with the depth and scope depending on their diversity, complexity and criticality (20.1). Installation and operational qualification must show that hardware and software suit their tasks (20.2). The system must have controls against unauthorised access or changes to data and against omissions, and a record of any data change must show the previous entry, who changed it and when (20.4). The same Schedule M text also covers written operating and maintenance procedures, a second check on critical manual entries, recording and investigating incidents, formal change control with records that show the system stays validated, and a back-up so records are not lost on failure. The text for active pharmaceutical ingredients repeats these points in its own section 5.4.

Interpretation: the notified text does not use the phrase "data integrity" in these clauses, but the access controls, audit-trail style change record, second check and back-up requirements are the practical content an inspector is likely to look for in a computerised system.

A made-up scenario

This scenario is invented to show a planning method and describes no real manufacturer. A small oral solid dosage plant compares its current practice with the Schedule, clause by clause. The team finds that its product reviews are done only for the three largest products, that its change requests do not name software changes, and that no one owns the validation master plan. It lists the gaps, ranks them by risk to patients, and puts the cheapest high-risk fixes first: write the review procedure for all products, add software to the change form and name an owner for the plan. Equipment and building changes follow, as they need budget and lead time.

Planning the upgrade

Interpretation: a gap assessment against the full text is the first step, and the output should be a register of gaps with an owner, a risk rating and a date. Procedural gaps can close fast. Physical gaps need capital and have long lead times, so they set the real end date. For smaller manufacturers, a phased plan helps, provided that each phase is tied to evidence an inspector can see, such as a signed procedure, a qualification report or a completed product review.

Readiness checklist

  • Is there a documented quality manual and a record of the last management review?
  • Does every product, including export-only products, have a product quality review?
  • Is there a validation master plan with a named owner and a periodic review?
  • Do change control forms cover facilities, equipment, computer hardware and software?
  • Are complaints, recall procedures and self-inspection records current?
  • Is the manufacturer's current compliance position confirmed with the licensing authority?

References

  • Ministry of Health and Family Welfare, G.S.R. 922(E) of 28 December 2023, revised Schedule M (Gazette notification, CDSCO): cdsco.gov.in
  • Press Information Bureau, Conditional extension of timeline to small and medium pharmaceutical manufacturers for compliance with revised Schedule M (12 February 2025): pib.gov.in
  • Press Information Bureau, Steps taken to prevent sale of adulterated drugs (12 August 2025): pib.gov.in
  • Ministry of Health and Family Welfare, G.S.R. 127(E), 11 February 2025, Drugs Amendment Rules, 2025 (extension for small and medium manufacturers, Form A): cdsco.gov.in