Pharmaceutical supply chain resilience: dual sourcing, API risk and regional manufacturing
What the FDA Drug Shortages Task Force and ICH Q9(R1) and Q10 say about shortage causes, supplier oversight and quality-system early warning, and how a manufacturer can map and reduce single points of failure, as of 27 November 2026.
A supply chain looks resilient until one link fails. Most medicines pass through several companies and countries before reaching a patient: starting materials, an active pharmaceutical ingredient (API), a finished dosage form, packaging and distribution. A fault at any point can stop the whole line. This article uses two regulatory sources to describe why shortages happen and how a manufacturer can map and reduce its own exposure.
Last reviewed: 27 November 2026. Passages marked as interpretation are the author's analysis, not findings of the sources. The sources are the U.S. FDA Drug Shortages Task Force report (October 2019, updated February 2020) and the ICH Q9(R1) and Q10 guidelines. The FDA data describe U.S. shortages in the years the report covers, so they should not be read as a current global picture.
What the FDA found
The FDA Task Force looked at 163 drugs regulated by its drug centre that went into shortage between 2013 and 2017. Of those, 63 percent were injectables and 67 percent had a generic version on the market. They were also old drugs, with a median time since first approval of almost 35 years, and they sold at low prices before the shortage. The Task Force named three root causes.
- Lack of incentives to produce less profitable drugs. Intense price competition and uncertain revenue reduce the motivation to invest in manufacturing quality and redundant capacity, and contracting practices contribute to a "race to the bottom" in pricing.
- The market does not recognise and reward mature quality management. Purchasers have little information on the quality management of a given facility and little information that links the drugs they buy to the facilities that made them, so the market cannot reward back-up manufacturing capability or risk management plans.
- Logistical and regulatory challenges slow recovery after a disruption. The report says the supply chain has become longer, more complex and fragmented as production moved overseas and contract manufacturers were used more. Raising output can need approvals from several national regulators or a new source of API.
What the quality guidelines add
ICH Q9(R1) added a section that links quality risk management to product availability. It says quality and manufacturing issues, including GMP non-compliance, are a significant cause of shortages, and that more complex supply chains create interdependencies that can bring systemic risks. It lists factors that can affect supply reliability, including process variability and state of control, the robustness of facilities and equipment, and oversight of outsourced activities and suppliers. It describes an effective quality system, with quality risk management and knowledge management, as an early warning system for risks arising at the company or its external partners.
ICH Q10 says the company is ultimately responsible for outsourced activities and purchased materials. It asks the company to assess the suitability and competence of a supplier or contractor before selecting it, to set responsibilities and communication in a written agreement for outsourced activities, to monitor performance, and to check that incoming materials come from approved sources through the agreed supply chain.
Mapping the chain
Interpretation: a map starts at the finished product and works backward: which site fills and packs it, which site makes the API, which companies supply the key starting materials and critical components, and which sites test and release. For each link, record the number of approved sources, the country or region, the lead time and the regulatory filings that name the source. The aim is to find links with one approved source, links concentrated in one place, and links that need long approval before a switch. Tier-two suppliers, the suppliers of your suppliers, are the usual blind spot, so ask each key supplier to name its own critical sources.
Dual sourcing has a regulatory cost
The FDA report notes that a new manufacturer must file and wait for approval before it can supply a market, and that changing source of API can follow from raising output. Interpretation: a second source is therefore a project that starts long before a disruption. It needs a qualified supplier, a quality agreement, supporting data and a filing, and it may also need the change to be handled as a post-approval variation. A second source that has never been used and never been tested for quality is a weak back-up.
Quality agreements and change notification
Q10's expectations give the practical frame. The company assesses the supplier before selection, writes down who is responsible for what, monitors performance and checks the source of incoming material. Interpretation: change notification clauses matter most here. A supplier who moves a process to a new site without telling the buyer can turn a dual-source plan into a single-source risk overnight.
What current shortage-prevention guidance asks for
The European Medicines Agency's guidance on implementing Shortage Prevention Plans, dated 17 July 2026, says the new pharmaceutical Regulation includes an obligation for marketing authorisation holders to put in place and keep up to date a shortage prevention plan for any prescription medicinal product in the EU. For products rated medium or high on its risk scale, the plan asks for a demand forecast methodology: a clear method showing how demand is calculated and monitored and what actions follow when demand rises or falls. The risk control strategy should say whether safety stocks exist, including buffer stocks held by the marketing authorisation holder and stocks held for a national stockpile, and whether other manufacturing sites for the active substance, critical raw materials or finished product are registered or under evaluation, with the time it would take to activate a site that is not currently active. It should also describe how distribution would be restricted if needed, for example by quota or by prioritising patients.
The FDA's draft guidance on risk management plans to mitigate the potential for drug shortages takes a similar line from the US side. It is a draft, issued for comment, so it shows the agency's current thinking rather than a final requirement. It names limits in forecasting future demand and discontinuation of components by suppliers among the causes of shortage, and describes redundancy, such as more than one supplier, as an example of a risk control strategy. The guidance suggests that the entity best placed to understand the whole supply chain, generally the application holder, builds the plan, and that contract manufacturers' plans address facility risks such as process control and equipment robustness. Risk factors it lists for a plan include geographic risks such as natural disasters, political instability and regulatory uncertainty, and sole-source manufacturers of critical components, active ingredients or the drug product.
Neither document sets a number for safety stock or says where a company should manufacture. Those choices stay with the manufacturer's own risk assessment and cost analysis.
Stock, demand and regional capacity
Interpretation: three levers sit beside sourcing. Safety stock buys time, and it works best when it is set by risk, with more cover for products that have one source or a long lead time and less for low-risk products. Demand planning reduces surprise by linking forecasts to real orders. Regional manufacturing or API capacity near the market shortens the distance and may ease approvals, though the FDA report does not evaluate these choices, so a company should test the cost and the quality effect case by case. Contract development and manufacturing organisations can add capacity, but under Q10 the company remains responsible for what they do.
A made-up scenario
This scenario is invented and describes no real company. A mid-sized firm sells an older generic injectable at a low price. A mapping exercise finds one API source and one filling site, both in one region. The team ranks the product as high risk because a single event could stop supply for months. It chooses a second API source first, because API changes take the longest to approve, and it starts the qualification, quality agreement and filing. In the meantime it raises safety stock for this product above the level used for its other products, and it asks the current API supplier to commit in writing to notify any site or process change. The cost of the extra stock is recorded and compared with the cost of a shortage.
Trade-offs
Interpretation: resilience costs money in stock, in a second source's qualification and in capacity that sits idle. The FDA report's first two root causes say the market often does not pay for this, so the business case has to rest on internal risk judgement, long-term contracts or a customer that values reliability. A quality system that can show a buyer how a site is managed gives the manufacturer something to point to.
A supplier-risk scorecard and continuity checklist (interpretation)
Interpretation: the points above can be turned into a simple scorecard that a quality or supply team fills in for each high-risk product. The scoring scale is a choice for each company, not a regulatory requirement.
- Source concentration: number of approved sources for the API, the key excipients and the filling site, and whether each is a single site or a single region.
- Hidden dependencies: whether the sources share an upstream starting-material supplier that the quality agreement requires them to disclose.
- Time to switch: estimated time to qualify and approve a second source, including any regulatory filing the change needs.
- Change notification: whether the quality agreement gives a written duty to notify changes and a defined notice period.
- Quality standing: inspection history, open corrective actions and the last audit date for each supplier.
- Stock position: safety stock held against the time to switch, set by product risk and not by one rule for all products.
- Early warning: whether supplier and contractor signals reach the quality system and trigger a review.
A continuity plan for each product can then record who decides to switch source, which second source is pre-qualified, how long existing stock lasts, who tells regulators and customers, and when the plan is next tested. A contract manufacturer can act as a second source or a regional capacity, but under the quality agreement it adds its own supply risk, so it is scored on the same lines as any other site.
Questions to ask
- Which products depend on one API source, one filling site or one region?
- Which suppliers have a written duty to notify changes?
- How long would it take to approve a second source for each high-risk product?
- Is safety stock set by product risk or by one rule for all?
- Does the quality system flag early warnings from suppliers and contractors?