Advanced therapy manufacturing: scaling cell and gene therapies without losing product quality
What the EU GMP guidelines for ATMPs and the FDA gene therapy CMC guidance say about batch separation, starting material handling and risk-based flexibility, and what it means for scale-up, as of 27 November 2026.
A tablet batch is made of thousands of identical units. An advanced therapy batch can be one patient's own cells. That difference changes what quality means on the manufacturing floor: limited material, variable starting cells, short shelf life and a patient who is waiting. This article looks at what two regulatory texts say about making advanced therapies under control, and where scale-up pressure lands.
Last reviewed: 27 November 2026. Passages marked as interpretation are the author's analysis. The sources are the European Commission's GMP guidelines for advanced therapy medicinal products (ATMPs) and the U.S. FDA guidance on chemistry, manufacturing and control (CMC) information for human gene therapy investigational new drug applications. Rules change, and national requirements vary, so confirm the current position before relying on them.
Why the product type changes the rules
The European guideline says ATMPs are complex and that risks differ with the type of product, the nature of the starting materials and the complexity of the process. It accepts that the finished product may show some variability because it uses biological materials and complex steps such as cell cultivation. It also states that making and testing autologous ATMPs, and allogeneic products in a donor-matched setting, poses specific challenges. The strategy for a high level of quality has to be tailored to the limits of the process, to limited batch sizes and to the variability of the starting material. The text names decentralised manufacturing for autologous products as one of the new manufacturing models that are emerging.
A risk-based approach, with limits
The guideline applies a risk-based approach to all types of ATMP and allows a degree of flexibility, especially for investigational products in early clinical phases where knowledge of the product, such as its potency, is still incomplete. It also says the expected level of detail in procedures and controls rises as development moves to later phases, and that an immature quality system can weaken a later marketing application if the product has not been adequately characterised. Competent authorities are encouraged to be consulted on how the approach is applied in early trials.
Where short shelf life or scarce material limits release testing, the guideline points to real-time testing and to reinforced process validation. As an example, it says assays such as potency or proliferation testing may be run after batch release as supporting data for process validation. Interpretation: for a fast-turnaround therapy, validation carries more of the load that end-product release testing carries elsewhere, so a thin validation package is a larger risk than usual.
Keeping batches apart
Mix-ups and cross-contamination are the central facility risks. The guideline requires that activities on different starting materials or finished products be separated in place or in time. Producing two different ATMPs or batches at once in the same area is not acceptable, with exceptions for closed and contained systems under conditions. More than one closed isolator may be in a room at the same time if there are measures against cross-contamination, separate exhaust of air and regular integrity checks. When two isolators process different viral vectors in one room, the text calls for full air exhaustion from the room and facility with no recirculation, and for closed, separate and unidirectional waste handling. Several biosafety cabinets in one room are acceptable only with effective technical and organisational separation, and different batches may share an incubator only if physically separated, for example in closed vessels. Replication-competent vectors, or products based on them, may not be incubated or stored at the same time as other materials.
For a first-in-human trial, the guideline allows production in an open system in a grade A critical area with a grade C background where controls against microbial contamination, separation of procedures and validated cleaning are in place.
From collection to vector production
The FDA guidance asks sponsors for a detailed description of vector manufacture: culture and expansion steps, transfection or infection, harvest, hold times, purification, concentration or buffer exchange, the reagents used, and in-process testing such as titer and impurities. It states that the vector, as a drug substance, should be made under current good manufacturing practice appropriate to the stage of development. For cells collected by leukapheresis, it asks how the collected material is labelled, stored, tracked and transported to the manufacturing site, and it stresses standard handling procedures across collection sites in multi-centre trials, with a list of the sites. For autologous cells, donor eligibility determination is not required, but the sponsor is asked to consider whether its process could increase risk to the patient by propagating pathogens that may be present in the donor.
Interpretation: these requests show why chain of identity and chain of custody sit at the centre of the process. The cells belong to one patient and must return to that patient. Every label, transfer and storage step needs a record that survives a mix-up check.
Potency and release testing
The FDA's guidance on potency assurance for cellular and gene therapy products says each lot of a licensed product must be tested for potency, on a sample taken after the manufacturing steps that may affect potency are finished. Its example: if cryopreservation poses a high risk to potency, the potency assay should use a sample taken after cryopreservation. The guidance also says potency cannot be assured by release testing alone, so release testing is one part of a wider potency assurance strategy that includes process design, in-process testing and continued process verification. For most cell and gene therapy products, lot release testing should include at least one bioassay that measures a biological activity related to the intended therapeutic effect, and because these products usually have several potency-related quality attributes, the strategy should typically include multiple release assays.
The EU guideline sets out how strict method validation must be by stage. At first-in-human stage, sterility and microbial assays should be validated, along with other assays that protect patient safety. Potency assays are expected to be validated before pivotal clinical trials, and validation of methods for batch release and stability testing is expected in pivotal trials. All analytical methods should be validated by the time of the marketing authorisation application (section 10.4).
Moving the product: transport and release before all results
The EU guideline says transport conditions can have a crucial effect on the quality of an advanced therapy. They must be defined in writing, and the adequacy of the defined conditions, such as temperature and type of container, must be demonstrated. The same section states that compliance with the defined conditions during transport falls outside the manufacturer's responsibility unless that responsibility is assumed by contract, and outside the scope of GMP (section 10.5). That makes the contract between manufacturer, courier and treatment site the place where this responsibility is settled.
Some products have a short shelf-life and may need to be released before every quality control test is complete. The guideline allows batch certification in stages: a designated person assesses the batch records, environmental monitoring and available results for an initial certification that permits release for administration, and the final analytical results support final certification by the Qualified Person. The delegation and the procedure must be written down, and a procedure must say what happens, including liaison with clinical staff, if an out-of-specification result arrives after release (section 11.3.2).
Fresh or cryopreserved: the logistics from collection to infusion
FDA's January 2024 guidance on CAR T cell products (Considerations for the Development of Chimeric Antigen Receptor T Cell Products) treats the route from collection to infusion as a manufacturing and logistics design problem. It says CAR T cells may be formulated for fresh infusion or cryopreserved, and that the choice depends on the development strategy and practical constraints. Fresh product has a limited shelf life before quality degrades, so FDA recommends that the maximum time between formulation and infusion be defined and supported by stability studies. The window for release testing is also short. The guidance therefore calls for well-designed logistics covering the timing of sampling and testing for lot release, reporting of quality control results and quality assurance review, scheduling of shipping, and receipt and handling of the fresh product at the clinical site.
Cryopreservation, in FDA's words, allows enough time for full release testing and flexibility in scheduling patients, and FDA generally recommends it when CAR T cells are made at a central location and shipped to clinical sites. For cryopreserved product the guidance adds that the risks of infusing the cryoprotectant should be assessed and that controlled thawing at the clinical site may be critical to quality.
The same guidance asks for procedures that control the cells during shipping to the clinical site whichever form is used, to be described in the investigational application and validated before licensure, covering shipping, receipt, storage and preparation for infusion. It asks for the same control of the leukapheresis starting material during shipping to the manufacturing site, for example temperature control, with handling procedures in place at every collection site. In-use stability studies should support the hold time between formulation and administration for fresh product, or between thaw and administration for cryopreserved product. For autologous products, FDA notes that early-phase studies show how long manufacture takes and whether bridging therapy will be used while the patient waits.
Interpretation: for an autologous product the time between collection and infusion is shared by the collection site, the manufacturing site, the courier and the treatment centre, so each handoff needs an owner and a record. The guidance sets no target turnaround time, and this article does not give one.
Traceability and preventing cross-contamination
The EU GMP guidelines for advanced therapy medicinal products ask for a system that tracks the cells or tissues in the product in both directions, from the point of donation through manufacturing to delivery of the finished product to the recipient. The system can be manual or electronic and should be in place from the start of manufacturing batches for clinical use. Following Article 15 of Regulation 1394/2007, traceability data should also cover raw materials and all substances that come into contact with the cells or tissues. Manufacturers keep the data for at least 30 years after the product's expiry date unless the marketing authorisation sets a longer period. The retained data include the donation identification code from the tissue or blood establishment and an internal code that identifies the starting material throughout manufacture up to batch release, with the link between the two always recoverable.
For cross-contamination, the same guidelines list measures to consider according to the risk: segregated premises, campaign manufacturing in a dedicated area followed by cleaning of validated effectiveness, closed systems for processing and transfers, air-locks and pressure cascades, single-use disposable technologies, and adequate cleaning procedures. Where cleaning is used, the guidelines say the method should be adapted to the product and process and justified by risk assessment. Single-use technology is therefore one option among several, not a requirement.
Interpretation: for an autologous product, where each batch is one patient's cells, the donation code, the internal code and the delivery record are what stop two patients' material from being confused, so the identity link deserves the same validation effort as any process step. The guidelines quoted here do not say how a particular single-use assembly should be qualified; that sits with the supplier data and the manufacturer's own risk assessment.
Comparability when the process changes
The European Medicines Agency's questions and answers on comparability say process changes are frequent in advanced therapy development: equipment, raw materials, starting materials such as cells or vectors, scale, or a new manufacturing site. The amount of comparability data depends on how critical the change is and its estimated effect on product characteristics. Comparability is not a demonstration of similarity as for a biosimilar. ICH Q5E is outside the scope for these products, though its general principles can be applied: stepwise work starting with physicochemical and biological properties, focus on the process steps best placed to detect the change, and analytical methods that are sensitive enough to detect differences.
The same document prefers side-by-side testing of pre- and post-change material in the same analytical run, ideally with the same batch of raw materials, and a split-based approach to remove variation from the cell starting material, which matters most for patient-specific (autologous) products. Comparing post-change data with historical pre-change data is not recommended but can be acceptable when side-by-side work is not possible, provided the variable factors are evaluated. It also says processes should be compared as well as products, particularly when a new site is introduced, using in-process data such as expansion profiles and step yields.
A made-up scenario
This scenario is invented and describes no real facility. A site makes an autologous cell product for patients in several hospitals. Samples arrive from collection centres in labelled bags with a patient code. On receipt, two operators check the code against the batch record before the bag enters the clean area. The site runs one patient batch in each closed isolator, and the team schedules a full clean-down and a check of the exhaust integrity between batches. When demand rises, the plant manager asks whether it can add a second batch in the same room. The quality unit refuses until the site shows separate air exhaust, waste handling and material flows, and the plan goes ahead only after those controls are verified. Growth is slower than the manager hoped, and no batch has been mixed up.
Scaling without losing control
Interpretation: scale-up for these products can take three forms. Scale up means larger vessels, which suits allogeneic and vector processes. Scale out means more parallel lines, which suits autologous processes but multiplies the mix-up risk. Decentralisation means smaller sites closer to patients, which the European text acknowledges as an emerging model and which raises the need for consistent procedures across locations. Each form needs the process to be well characterised, and the guidelines tie flexibility to the level of knowledge available.
Questions to ask before scaling
- Can every unit be traced to one patient or donor at each step, with records that a second person can check?
- Does the facility separate batches in place or time, and is the separation shown, not just stated?
- Is release testing realistic for the shelf life, and does validation make up for any limits?
- Are collection and handling procedures standard across all collection sites?
- Does the plan for added capacity say how mix-up and cross-contamination risks change?
