Click to Sign up for a Free Newsletter read by 50,000 people across the world

NewsArticlesInterviewsPress releasesRegulatoryResourcesCompaniesProductsMaterialsMachineryEventsSearchNewsletter

Home › Article

Article

EU GMP Annex 1: what aseptic manufacturers should prioritise after implementation

Published on Pharmaceutical Weekly 27 November 2026 · 7 min read

By Helen Davidson

Illustration of a sterile filling machine with isolator gloves, vials on a conveyor and airflow arrows
Image credit: Illustration for Pharmaceutical Weekly · Image source

A reading of the revised EU GMP Annex 1 text: contamination control strategy, barrier technology, environmental monitoring and aseptic process simulation, as of 27 November 2026.

The revised EU GMP Annex 1, Manufacture of Sterile Medicinal Products, was published by the European Commission on 25 August 2022. Its deadline for coming into operation was 25 August 2023, except for point 8.123 on lyophilisers, which was postponed to 25 August 2024. For sterile-drug manufacturers the question now is less "what changed" and more "where should the quality unit spend its time". This article reads the Annex text and suggests priorities. Where it moves from the text to judgement, it says so.

Last reviewed: 27 November 2026. The Annex text below comes from the Commission's published PDF. Check the current version and your own regulator's expectations before relying on any statement.

What the Annex is, and how to read "should"

The Annex describes itself as guidance for the manufacture of sterile products, and says quality risk management applies to the document as a whole. It also says that where specific limits, frequencies or ranges are given, they should be considered a minimum requirement. Its wording is mostly "should". Whether a given gap becomes an inspection finding is for the inspector and the manufacturer's own risk assessment to settle, so this article treats any ranking of priorities as interpretation.

1. The Contamination Control Strategy (CCS)

Point 2.3 asks for a CCS implemented across the facility, defining all critical control points and assessing the effectiveness of design, procedural, technical and organisational controls and monitoring measures. The CCS should be actively reviewed, drive continual improvement, and form part of periodic management review. Existing control systems that are well managed do not have to be replaced, but should be referenced in the CCS, with their interactions understood.

Point 2.5 lists the elements a CCS should consider (not limited to them), starting with the design of the plant and processes. Point 2.6 adds ongoing and periodic review, with changes assessed for their impact on the CCS before and after implementation.

Interpretation: points 2.3 and 2.4 stress collective effectiveness, so a CCS that only lists existing procedures, without showing how they interact, is a reasonable place to look for gaps in a self-assessment.

2. Barrier technology: RABS and isolators

Point 4.3 says RABS or isolators are beneficial in minimising contamination linked to direct human intervention in the critical zone, that their use should be considered in the CCS, and that any alternative approach should be justified. The Annex separates the two technologies. For RABS, the background environment should correspond to a minimum of grade B, and airflow pattern studies should show the absence of air ingress during interventions. For isolators, the background for open isolators should generally be a minimum of grade C, with closed isolators a minimum of grade D. The Annex says the background classification should rest on risk assessment and be justified in the CCS. Glove material should be shown to have suitable mechanical and chemical resistance, and the glove replacement frequency should be defined within the CCS (point 4.21).

3. Environmental monitoring and trending

Section 9 states that the monitoring programme forms part of the CCS. It adds that viable, non-viable and aseptic process simulation results, when taken in isolation, are limited and should not individually be considered an indicator of asepsis. Taken together they help confirm the reliability of design, validation and operation.

  • Limits. Point 9.9 asks for alert levels and action limits for viable and total particle monitoring. Tighter action limits may be applied based on trending, the process or the CCS. Alert levels should come from cleanroom qualification results and be reviewed against ongoing trend data.
  • Trends. Point 9.11 says procedures should define the approach to trending, including rising excursions, consecutive alert-level excursions, and isolated excursions that may share a cause, such as ones that follow planned maintenance.
  • Excursions. Under 9.13, an action-limit excursion calls for a root cause investigation, an assessment of product impact (including batches produced between monitoring and reporting) and corrective and preventive actions. An alert-level excursion calls for assessment and follow-up.

4. Aseptic process simulation (APS)

Point 9.32 says the APS should not be the primary means of validating the aseptic process. Effectiveness is shown through process design, the pharmaceutical quality system, process controls, training and evaluation of monitoring data. Point 9.38 asks for at least three consecutive satisfactory simulations in initial validation covering all working shifts, repeats after significant changes, and normally twice a year for each aseptic process, filling line and shift, with each operator taking part in at least one successful APS annually. Under 9.46 the target is zero growth, and any contaminated unit fails the APS and triggers an investigation. Point 9.49 lists when initial validation is repeated, including after a long period without operation.

5. Design, utilities and transfers

The Annex also covers facility and equipment design (section 4), utilities such as water and gases (section 6, which asks for regular trend analysis of critical parameters for high-risk utilities), and the transfer of materials into grade A and B areas, which should be through a unidirectional process (point 4.11). Lyophilisers have their own point, 8.123, with the later date noted above.

Cleanroom design, air supply and sterilisation

Section 4 of the Annex starts from the premises. Sterile manufacture takes place in cleanrooms entered through change rooms that act as airlocks for people and for equipment and materials (point 4.1). Four grades are defined in point 4.4: grade A for the critical zone of high-risk operations such as the filling zone, grade B as the background to grade A where it is not an isolator, and grades C and D for less critical stages. The Annex says unidirectional airflow should be shown and qualified across the whole grade A area, and that direct operator intervention into grade A should be minimised by design. Exposed surfaces should be smooth, impervious and unbroken, and recesses, ledges and shelves kept to a minimum so rooms can be cleaned and disinfected repeatedly (points 4.5 to 4.7).

Point 4.14 asks for a filtered air supply that keeps positive pressure or airflow relative to a lower-grade background under all operational conditions, with a guidance value of at least 10 Pascals between adjacent rooms of different grades. Containment of hazardous materials can change that arrangement. Point 4.15 asks for airflow patterns to be visualised, so that it can be shown that air does not travel from lower-grade areas into higher-grade ones or over operators or equipment that could carry contamination into them.

Sterilisation sits in section 8. Point 8.34 says finished product should be terminally sterilised where possible, because that gives greater assurance of sterility than validated sterile filtration or aseptic processing, and that where terminal sterilisation is not possible, post-aseptic terminal heat treatment combined with aseptic processing can be considered. All sterilisation processes should be validated (8.36), including physical measurements and, where appropriate, biological indicators, with validated loading patterns that are periodically revalidated (8.38). Items that have been sterilised should be clearly distinguishable from those that have not (8.44), and each sterilisation run needs a record with a unique cycle identifier, reviewed as part of batch certification (8.45).

Illustrative scenario

This is a made-up example, not a named company. A filling site reviews its CCS and finds that its environmental monitoring trend report lists excursions but never links them to maintenance events. Using point 9.11 as a guide, the team adds a check that flags excursions following planned maintenance, and records the link in the CCS review.

Audit-readiness checklist (interpretation)

  • Can you show where the CCS covers each element in point 2.5, and how it is reviewed?
  • Is each use of RABS or isolators, or any alternative, justified in the CCS?
  • Do monitoring procedures define trending, alert levels and action limits, with a documented basis?
  • Do investigation procedures cover product impact for batches made before a result was reported?
  • Do your APS schedule and acceptance criteria match section 9, or is the difference justified?
  • Have changes to HVAC, equipment, shifts or personnel numbers triggered an APS assessment?

Related reading on Pharmaceutical Weekly: regulatory updates, machinery and resources.

References

  • European Commission, EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products (revision published 25 August 2022): health.ec.europa.eu (PDF)
  • European Commission, announcement of the revision and its dates for coming into operation: health.ec.europa.eu

Pharmaceutical Weekly newsletter

One email each month: new products, regulatory updates and a featured article.
Subscribe